There are two stages in dealing with the Council, obtaining both Full Planning Permission and Building Regulation Approval. You should do both at the same time.
Services were close to the site.
Access for the large vehicles needed to deliver to the site was very restricted.
Ground conditions were poor. A Structural Engineer did a Soil Survey and established that we needed a piled foundation, for which he drew up detailed plans.
Thus we had a mixture of joys and problems typical of a lower end of market building plot.
|